WEBVTT

00:00.501 --> 00:10.464
This session demonstrates a real worker failure. I pause the two x86 workers so that the AArch64 virtual machine receives the next
assignment.

00:16.630 --> 00:28.790
I have cut power to the AArch64 worker while its tile is still uncommitted. Its console stops. The coordinator keeps the outstanding
lease rather than immediately trusting another result.

00:29.682 --> 00:39.794
I resume worker one. Recovery waits for the bounded lease to expire. This waiting is shown at real time; there is no cut or speed
increase hiding the delay.

01:14.482 --> 01:26.300
The expired assignment was retried and worker one committed the replacement tile. The orange border and the audit expose the second
attempt. The pixels still match the independent reference.

01:26.700 --> 01:36.748
Now I reboot the AArch64 worker using its original volume and start the same Hew worker again. Its stable application identity is
preserved.

01:50.396 --> 02:02.641
With the other workers paused, the rejoined AArch64 worker has completed a new job. These are new verified commits after a real
power loss, not merely a reconnected status indicator.
